Updated 25 September 2026

Back boiler to combi cost UK 2026

The going rate for back boiler to combi in 2026 is £3,500–£6,000 (total, ex VAT). Below: a calculator, what the job involves, materials at three price levels, and the prep that changes the price.

Market band£3,500–£6,000
Worked example, 1 install£3,684
Time on site2.5 days

Back boiler to combi calculator

Price a real job freeUses your rates, your speed and your receipts.

Market band source: Heatable.

What the job involves

StageTaskTypical time
outRemove back boiler and gas fire8 h
outRemove cylinder and loft tanks, cap off4 h
inRe-route and cap pipework6 h
inFit boiler, flue and controls5 h
inPower flush the system4 h
inClose off and make good the fireplace3 h

Materials at three price levels

MaterialBudgetTrade choicePremium
Combi boiler (A-rated, 25–30 kW)
each
£750
Entry combi, 7-year warranty — Lowest cost compliant boiler
£1,000
Mid-range combi, 10-year warranty — Reliable, parts easy to get
£1,500
Premium combi, 12-year warranty — Quieter, better hot water
Magnetic filter and cleanser
each
£90
Basic magnetic filter — Catches sludge
£130
Branded filter and cleanser — Protects the heat exchanger
£180
Dual-action filter — Best protection
Flue kit
each
£60
Standard horizontal flue — Straight out the wall
£90
Telescopic flue — Fits the wall thickness
£120
Vertical or plume management kit — Awkward terminal positions
Heating controls
each
£40
Wired programmable stat — Meets Part L controls
£80
Wireless programmable stat — Place it anywhere
£180
Smart thermostat — App control
Valves, pipe, fittings and condensate
allowance
£50
Standard fittings — Connects up
£80
Fittings plus frost-protected condensate — No frozen condensate
£120
Full copper tails and lagging — Tidy, efficient
Conversion pipework and caps
allowance
£180
Plastic pipe and caps — Re-route and cap off
£300
Copper re-route — Durable
£450
Copper plus new isolation valves — Tidy conversion
Power flush chemicals
set
£40
Standard cleanser — Shifts sludge
£60
Branded cleanser and neutraliser — Faster clean
£90
Heavy-duty descaler set — Badly sludged systems
Fireplace closure panel and vent
set
£60
Board and vent — Closes the opening
£100
Board, vent and trim — Tidy finish
£150
Plastered closure — Ready to decorate

Trade prices ex VAT, estimates checked 2026-09-25. Log your receipts in Grafto and your own prices replace these.

What changes the price

Prep to look for

ConditionCheckEffect
Sludge in the systemblack water from a bleed valve, radiators cold at the bottomPower flush the system
Possible asbestos laggingold grey or white pipe laggingPossible asbestos lagging: stop and test before disturbing
Microbore pipework8–10 mm pipes to radiatorsMicrobore: limits radiator upgrades and blocks easily — flush it

Questions

How much does back boiler to combi cost in the UK in 2026?

The researched market band is £3,500–£6,000 (total, ex VAT), from Heatable. A worked example of 1 install comes to about £2,928–£4,942 across budget, trade and premium materials.

How long does back boiler to combi take?

The worked example of 1 install takes about 2.5 working days.

What changes the price of back boiler to combi?

Mainly mains flow and pressure, plus any prep found on site: sludge in the system, possible asbestos lagging, microbore pipework.

More plumbing prices